| Advertisement ID | : | 1239913 |
| Category | : | Commercial / Industrial |
| Location | : | Baguio City, Benguet |
| Ads Classification | : | For Sale |
| Price | : | |
| Address | : | CAMP JOHN HAY BAGUIO CITY |
| Condition | : | New |
| Date Updated | : | 1 day, 20 hours ago (posted March 11, 2009) |
| Short URL | : | http://sulit.com.ph/1239913 |
WELCOME INVESTORS!.. LOOKING FOR A COMMERCIAL LOTS FOR LEASE UP TO 2046 INSIDE CAMP JOHN HAY BAGUIO?... NOW IS YOUR CHANCE TO AVAIL!... HURRY!
Planned Eco Village Development :
The consolidated lot area of the planned retail development, Eco Village is approximately 23,300 square meters. Eco Village is composed of two (2) clusters - north and south clusters containing 24 parcels, with lot area ranging from 164 to 675 square meters.
The site is located approximately 150 meters from the Loakan Gate at Camp John Hay, w/in the vicinity of the CAP convention center. The planned retail development is strategically placed adjacent to the future
7-building AYALA IT/BUSINESS PARK with expected 20,000 seats for BPO operations and commercial hub. The subject property is w/in the vicinity of a residential area w/more than 3,000 homeowners and will serve as Camp John Hay's main activity center...



ECO VILLAGE
CAMP JOHN HAY BAGUUIO CITY
ENJOY A FESTIVAL OF DIFFERENT SIGHTS, SOUNDS, SCENTS AND TASTES AT ECO VILLAGE, CAMP JOHN HAY'S CENTRAL HUB FOR ARTS AND CRAFTS, GOURMET DINING, AND RECREATIONAL ACTIVITIES.
MEANT TO SERVE AS THE MAIN ACTIVITY AREA IN CAMP JOHN HAY, THE INTERNATIONAL VILLAGE IS LOCATED ADJACENT TO THE INFORMATION AND TECHNOLOGY PARK (AYALA LAND INC. IT BUSINESS PROJECTS). THE VILLAGE FEATURES VARIOUS LOCATORS SUCH AS RESTAURANTS, CAFES, AND SHOPS WHERE VISITORS CAN GET THEIR BEST BUYS FOR THEIR SHOPPING AND "PASALUBONG".
THE INTERNATIONAL VILLAGE WILL BE COMPOSED OF LOT PADS RANGING FROM 550 SQUARE METERS TO 900 SQURE METERS. LOCATORS WILL BE INVITED TO LEASE LOTS ON A LONG TERM BASIS..
INITIALLY, AT THE SOUTH CLUSTER OF THE INTERNATIONAL VILLAGE, THERE ARE 10 LOTS TO BE OFFERED TO INTERESTED INVESTORS WHO MUST SUBMIT THE FOLLOWING DOCUMETS:
* LETTER OF INTENT
* COMPANY PROFILE
* BUSINESS PLAN & FINANCIAL STATEMENT
* BANK CERTIFICATE
APPLICATION WILL THEN BE STUDIED AND REVIEWED BY CJH DEVCO MANAGEMENT FOR APPROVAL..
| Infrastructure boom seen in Camp John Hay with entry of Ayala Land By Artemio A. Dumlao Updated June 30, 2009 12:00 AM |
BAGUIO CITY, Philippines — After a slow start, development inside Camp John Hay, the former American rest and recreation facility, is expected to accelerate.
More infrastructure projects are set for implementation as both the developer Camp John Hay Development Corp. (CJHDevCo) and its latest locator Ayala Land Inc. (ALI) will start soon “developments” in the area.
Alfredo Yñiguez III, CJHDevCo chief operating officer and Steve Dy, assistant vice president for Ayala Land Businesscapes, saidthe biggest project is the Eco Village which will be built right where the Filling Station is currently located.
The Eco Village will be a one-storey structure that will house restaurants, shops and an arts and culture center. It is envisioned to be a convergence area where al fresco dining and regular shows will be held, Yñiguez said adding that the structure will blend with Camp John Hay’s green and mountainous environment.
This is just the beginning he said as he pointed out that in the next five years as wellness, sports and recreation centers will also be built.
They are also currently rushing Phase 1 of The Suites, in time for the Advertising Congress in November. Baguio will host for the second time the biggest gathering of stakeholders in the Filipino advertising industry.
The Suites is a 366-unit condotel facility being built just beside the Manor. The Suites takes the place of what was once the 19th Tee Restaurant, a famous spot where golfers and guests converged for meals with a breath-taking view of the golf course.
Phase 1 involves construction of 200 rooms and Phase 2, 166 rooms.
For its part, ALI is set to develop an initial 2.6-hectare property where a “pedestrianized” type of mall will be constructed.
Dy said shops will be connected by covered walkways to allow people to walk, instead of riding. No trees will be cut, at least in the initial phase of development, he added.
Initial investment by ALI is around P500 million.
Its biggest development meanwhile is the construction of six to eight buildings, which will be used as its administration office and for business process outsourcing.
These buildings conform to the four-storey requirement of the city government.
An estimated 3,000 employees will be accommodated in each building.
ALI has acquired 12 hectares of the remaining 10 hectares left as open spaces and forest covers.
| Posted by | : | arman |
| Member Since | : | May 18, 2007 |
| Last Login | : | 12 hours, 1 minute ago |
| Feedback | : | no feedback yet |
| Address | : | email: avallesfino@yahoo.com, Metro Manila - Pasig City |
| Contact Nos. | : | (632) 655-5099, +63917-6121320 |
| Look For | : | armando p. vallesfino |
Discussion RSS Feeds ] 
