dear ms jocelyn mendoza,
pls see attachment for your approval. tx or call 09073051310. bernard
November 4, 2009
Ms. Jocelyn Mendoza
Dear Ma'am:
We are pleased to submit to you our quotation to drill well/ wells for you at the above address under the following terms and conditions:
WELL SPECIFICATION:
Well casing diameter : 6” straight casing
Approximate depth to drill : 400 ft. more or less
Type of casing : B.I. pipe sch. 40
SCOPE OF WORK:
- Mobilization and demobilization of equipments in and out of site with crew P 70,000.00
- Labor for drilling 400 ft. depth, @ P 750.00 per foot 300,000.00
- Installation of 6” pipes
- Perforation of 6” pipes, 200 ft. long @ P 150.00 per foot 30,000.00
- Beveling and welding 20 joints, @ P 550.00 per joint 11,000.00
- Surface grouting 30,000.00
- Installation of riser pipes
- Installation of submersible pump and motor
- Pumping test (maximum of 24 hrs),@ 650.00/ hr 15,600.00
Cost of Labor P456,600.00
NOTE:
All needed materials in pumping test are provided/ charged to the client.
MATERIALS:
1 lot Cistern tank, 2,500 gals. 155,000.00
10 pcs. 6” B.I. pipe, std @ P 12,515.98 ea. 125,159.80
20 pcs. 1 ¼ ” riser pipe, @ P 3,812.64 ea. 76,252.80
20 pcs. 1 ¼ ” France coupling @ P 220.00 ea. 4,400.00
1 pcs. Check valve 1 ¼ ”, @ P 4,500.00 ea. 4,500.00
1 pc. Drive shoe 6” 8,000.00 373,312.60
TOTAL COST OF LABOR AND MATERIALS P829,912.60
Thank you for giving us the opportunity to quote. We hope to be of service to you soon.
Very truly yours,
__________________________
Bernard Sinoy
Sales manager
MF DEEPWELL DRILLING
__________________________
MARINO J. PINEDA
General Manager
Page 2 of 2 MF Deepwell drilling quotation
CONDITIONS
- General cleaning of the site before and after the drilling shall be for the client’s account.
- Should it be found necessary to drill beyond 400 feet, we charge P750.00 per foot of additional drilling. Materials based on market price.
- The client shall provide all permits necessary for drilling.(IF NEEDED)
- We do not guarantee the quantity and quality of water obtaining in the well. We only guarantee the plumbness of the well and the development of the best possible sources of underground water.
- This offer shall constitute the drilling contract after having been duly signed by the contractor and the client on the spaces provided on the first page of the contract.
- Prices are subject to change if not approved within 10 days from the date hereof.
- The client shall provide water and supply electric current for lighting and welding purposes upon the start of drilling operation.
- Time of completion: 40 to 60 working days of smooth drilling.
- The CONTRACTOR’S liability arising out of defective workmanship is limited only to correction and replacement thereto. We give one year warranty on defective workmanship under normal operating condition.
- Damages on the well caused by third parties shall not be counted against the CONTRACTOR and likewise damages by fortuitous events shall not be counted against the CONTRACTOR but shall be considered as risk involved in the performance of the job.
TERMS OF PAYMENT:
We require payment of:
- 30% down payment upon signing the contract.
- 40% upon reaching 150ft.
- 20% upon reaching 300ft.
- Balance to be paid upon job completion
Message appended on November 12, 2009 02:12PMplease see our revised quotation including control pump and motor with tank.
November 10, 2009 REVISED
Ms. Jomalyn Mendoza
Dear Ma’am,:
We are pleased to submit to you our quotation to drill well/ wells for you at the above address under the following terms and conditions:
WELL SPECIFICATION:
Well casing diameter : 6” straight casing
Approximate depth to drill : 400 ft. more or less
Type of casing : B.I. pipe sch. 40
SCOPE OF WORK:
- Mobilization and demobilization of equipments in and out of site with crew P 70,000.00
- Labor for drilling 400 ft. depth, @ P 750.00 per foot 300,000.00
- Installation of 6” pipes
- Perforation of 6” pipes, 200 ft. long @ P 150.00 per foot 30,000.00
- Beveling and welding 20 joints, @ P 550.00 per joint 11,000.00
- Surface grouting 30,000.00
- Installation of riser pipes
- Installation of submersible pump and motor
- Pumping test (maximum of 24 hrs),@ 650.00/ hr 15,600.00
- Cost of Labor P456,600.00
NOTE:
All needed materials in pumping test are provided/ charged to the client.
MATERIALS:
1 lot Cistern tank, 2,500 gals. 155,000.00
1 pc 5hp pump and motor, 3 phase 75,000.00
400 ft. Royal cord cable #6/3 40,000.00
2 box TW wire @ 4000.00 ea. 8,000.00
1 unit Control box 20,000.00
4 pcs Electrode @ 350.00ea. 1,400.00
10 pcs. 6” B.I. pipe, std @ P 12,515.98 ea. 125,159.80
20 pcs. 1 ¼ ” riser pipe, @ P 3,812.64 ea. 76,252.80
20 pcs. 1 ¼ ” France coupling @ P 220.00 ea. 4,400.00
1 pcs. Check valve 1 ¼ ”, @ P 4,500.00 ea. 4,500.00
1 pc. Drive shoe 6” 8,000.00 517,712.00
TOTAL COST OF LABOR AND MATERIALS P974,312.00
Thank you for giving us the opportunity to quote. We hope to be of service to you soon.
Very truly yours,
__________________________
Bernard Sinoy
Sales manager
MF DEEPWELL DRILLING
__________________________
MARINO J. PINEDA
General Manager
Page 2 of 2 MF Deepwell drilling quotation
CONDITIONS
- General cleaning of the site before and after the drilling shall be for the client’s account.
- Should it be found necessary to drill beyond 400 feet, we charge P750.00 per foot of additional drilling. Materials based on market price.
- The client shall provide all permits necessary for drilling.(IF NEEDED)
- We do not guarantee the quantity and quality of water obtaining in the well. We only guarantee the plumbness of the well and the development of the best possible sources of underground water.
- This offer shall constitute the drilling contract after having been duly signed by the contractor and the client on the spaces provided on the first page of the contract.
- Prices are subject to change if not approved within 10 days from the date hereof.
- The client shall provide water and supply electric current for lighting and welding purposes upon the start of drilling operation.
- Time of completion: 40 to 60 working days of smooth drilling.
- The CONTRACTOR’S liability arising out of defective workmanship is limited only to correction and replacement thereto. We give one year warranty on defective workmanship under normal operating condition.
- Damages on the well caused by third parties shall not be counted against the CONTRACTOR and likewise damages by fortuitous events shall not be counted against the CONTRACTOR but shall be considered as risk involved in the performance of the job.
TERMS OF PAYMENT:
We require payment of:
- 30% down payment upon signing the contract.
- 40% upon reaching 150ft.
- 20% upon reaching 300ft.
Balance to be paid upon job completion